Off-grid Solar Systems

Solar off-grid systems are installed on stand alone basis without any support from utility grid. They use batteries as storage devices of electricity that gets charged during the day and meets electricity needs during night. This way these systems ensure a 24 hour power supply.

Gensol follows a systematic process for Project Execution:

Load Assessment

Load Assessment for light and industrial or heavy loads of the building in order to calculate the system capacity.

Prefeasibility Study

Prefeasibility Study of the available area to analyze system capacity & structuring, climatic parameters, stability to tolerate the module load, shading and grid accessibility connectivity.

Vendor Finalization

Vendor Finalization for equipments required all through the project along with qualified civil and electrical contractors.

Project Planning

Project Planning including preparation of detailed engineering drawings, project execution plant, plant lay out and others.

Delivery of Equipment

Delivery of Equipment to project site after comprehensive testing done based on random sampling method to ensure quality and consistency.

Installation and Commissioning

Installation and Commissioning of the plant's mounting structure, modules and other electrical equipments. This also covers the deployment of necessary monitoring system. Conducting test run and final handing over is done further to this.

Related Links

Further Interest

Downloads

Request A Meeting

Contact Us

Updates

  • 14 Dec.: Anmol Jaggi speaks on Bankability of Solar Power in India at Intersolar
  • 14-16 Dec.: Join us at Stand No. 6482 at Intersolar at Bombay Exhibition Center


Designed by Brand Aid